Tweed Regional Aquatic Centre (TRAC)

The Tweed Regional Aquatic Centre is situated in the township of Murwillumbah, in northern New South Wales. The project consisted of fast track programme delivery of both indoor and outdoor aquatic facilities.

The centre facilities comprises of:

Refurbished 8 lane outdoor 50m pool—with wet edge finish

400 seat covered grandstand

Outdoor Kids Leisure Pool

Water Slide

Indoor combined Diving / 25m program pool

Indoor Hydrotherapy Pool

Indoor Learn to Swim pool

Administration offices, function room, amenities and Cafe

275 Multi Storey Car Park facility

"Winner of the 2009 Queensland Master Builders Regional Awards—Sporting and Community Facilities"

Architect—
Multi Span Australia Pty Ltd

Engineer—
Multi Span Australia Pty Ltd

Builder—
Multi Span Australia Pty Ltd

Completion—
2008

Category—
Education

Tag—
Aquatics

Mt St Michael's College

Mt St Michael's College Ashgrove in Queensland required an aquatic facility for the development of aquatic sports and water based education.

A 25m 6 lane competition swimming pool with an integrated water polo field maximised the efficient use of school grounds as single pool design.

This facility utilises the latest in sustainable water filtration and sanitation through the use of an on-site in-line electrolysis system capable of producing chlorine in fresh water.

Facilities:

25m 6 Lane Swimming Pool

Water polo Field

Shade Sail Structure

Pool Filtration Room

Desiger—
Leisure Engineering Pty Ltd

Builders—
Multi Span Australia Pty Ltd

Pool Builder—
Baldwin Aquatics

Completion—
2010

The Mitchell Aquatic Centre

The Mitchell Aquatic facility located in the township of Mitchell in rural Queensland, also known as the gateway to the Outback.

The overall facility Master Plan and stage 1 redevelopment was to maximise and to create an identity of each individual activity in which the town hall, Great Artisan Spa and memorial swimming pools centre delivers to the local community and to the travelling tourist trade.

The stage 1 works involved the aquatic development of a 25m 6 lane competition swimming and program pool, a zero depth children’s water play area, the refurbishment of the existing entry administration and amenities building and facility service upgrades.

Architect—
Multi Span Australia Pty Ltd

Engineer—
Multi Span Australia Pty Ltd

Builder—
Multi Span Australia Pty Ltd

Pool Engineer—
Leisure Engineering Pty Ltd

Pool Builder—
Baldwin Aquatics

Completion—
2010